EBSILON®Professional Online Documentation
Data Transfer and Results Display / Create Report / The Sub-Reports / Condenser & Pre-Heater
In This Topic
    Condenser & Pre-Heater
    In This Topic

    Condenser & Preheater


    Documentation of the design constants as well as the process data of the condenser and the pre-heater.

    Components:

    • Condenser (component 7)
    • Feed water pre-heater (Cond-part) (component 10)
    • After-cooler (component 27)
    • Desuperheater (component 43)
    • Universal heat exchanger (component 55)
    • Economizer / Evaporator/ Super-heater (component 61)
    • Condenser (old) (component 67)

     

    Example:

    Alstom Plant: KA-24  Unit: 1 R-Date: 21.12.2004 16:51:14

     

    Title for the Condenser or the Pre-heater

    of_a_steam_turbine

     

     

     

     

    Nominal

    Calculated

     

    Transferred heat quantity

    156653.0

    162400.2

    [kW]

    Primary pressure drop

    0.492

     

    [bar]

    Secondary pressure drop

    0.000

     

    [bar]

    Primary mass flow

    2993.720

     

    [kg/s]

    Secondary mass flow

    70.885

     

    [kg/s]

    Lower terminal temperature difference

    15.70

    15.72

    [K]

    Upper terminal temperature difference

    3.40

    3.56

    [K]

    k*A

    19306.50

    19838.62

    [kW/K]

     

    M
    [kg/s]

    P
    [bar]

    T
    [°C]

    H
    [kJ/kg]

    Q
    [kW]

    Ts
    [°C]

    Coolant inlet
    Coolant outlet
    Waste steam inlet
    Auxiliary condensate inlet
    Condensate outlet

    3200.000
    3200.000
    73.781
    0.348
    74.129

    2.000
    1.438
    0.065
    0.065
    0.065

    22.00
    34.16
    37.72
    31.86
    37.72

    92.4
    143.2
    2359.1
    133.5
    157.9

    295710.6
    458110.8
    174059.4
    46.4
    11705.7

    .
    .
    37.72

     

    Comments on the protocol:

    • The saturated steam temperature Ts is calculated via the water/steam table


    Generate sub-report 

    • Select the condenser or the pre-heater in the model.
    • Call the dialog box "Modifying Sub-Reports".
    • Select the sub-report "Condenser / Pre-heater" and import it in the list of the sub-reports.
    • Enter an extra title, if needed.
    • Select the sub-report for the condenser / pre-heater and then click the button "Modify" or else double-click the sub-report for the condenser / pre-heater.
      The dialog box "Edit Sub-Report" now opens.
    • A click on the button "Insert (Sel.)" inserts the components selected earlier in the cycle in the list of the components of the sub-report.
    • Close the dialog box for the list of the components through the button "Close".
    • Close the dialog box for modifying the sub-protocol through the button "Close".

     

    The components selected earlier are inserted in the sub-report in the order, in which they were selected.

    If several components are selected, then a separate report is generated for each component.